Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 35 results ...

Adams, F K (2004) The management of risks in international infrastructural projects, Unpublished PhD Thesis, Department of Business Studies, University of Edinburgh.

Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation, Unpublished PhD Thesis, School of Engineering, University of Edinburgh.

Al-Remal, A M (2013) Risk-based design of structures for fire, Unpublished PhD Thesis, , University of Edinburgh.

Alsedairy, F S (2019) Dynamics of mega infrastructure decision-making in Saudi Arabia, Unpublished PhD Thesis, School of Engineering, University of Edinburgh.

Baker, A J (2019) ‘Suitable and sufficient’? UK regulation of post-construction fire safety, Unpublished PhD Thesis, School of Social & Political Science, University of Edinburgh.

Baker, H (2021) A multimethod approach to learning from text-based construction failure data, Unpublished PhD Thesis, , University of Edinburgh.

Bartlett, A I (2018) Auto-extinction of engineered timber, Unpublished PhD Thesis, , University of Edinburgh.

Campbell, J M (2008) Safety hazard and risk identification and management in infrastructure management, Unpublished PhD Thesis, School of Engineering, University of Edinburgh.

Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations, Unpublished PhD Thesis, School of Engineering, University of Edinburgh.

Eid, M E M (2004) Rethinking relationships in the construction industry: integrating sustainable development into project management processes, Unpublished PhD Thesis, Department of Architecture, University of Edinburgh.

French, T R (2012) Evolutionary optimisation of network flow plans for emergency movement in the built environment, Unpublished PhD Thesis, , University of Edinburgh.

Furber, A (2013) The social and cultural context of rural water and sanitation projects: case studies from Ghana, Unpublished PhD Thesis, School of Engineering, University of Edinburgh.

Glendinning, M (1991) 'Give the people homes!': Britain's multi-storey housing drive, Unpublished PhD Thesis, Edinburgh College of Art, University of Edinburgh.

Graham, D (2005) Stochastic modelling and analysis of construction processes, Unpublished PhD Thesis, School of Engineering, University of Edinburgh.

Hashim, R (2018) Green innovation adoption in the construction sector : the role of absorptive capacity and the effect of environmental requirements, Unpublished PhD Thesis, Business School, University of Edinburgh.

Hellowell, M S (2012) Fair return for risk? An examination of structure, competition and profitability in the market for private finance in the National Health Service, Unpublished PhD Thesis, School of Social and Political Science, University of Edinburgh.

Hsiao, C C (2000) Constructing a sustainable impact assessment methodology : an evaluation of Taiwanese EIA of high-rise building, Unpublished PhD Thesis, College of Art, University of Edinburgh.

Jackson, D J (2020) Addressing the challenges of reducing greenhouse gas emissions in the construction industry: a multi-perspective approach, Unpublished PhD Thesis, Business School, University of Edinburgh.

Jiménez-Moreno, P (2020) Mass customisation for zero energy housing: the potential of Japanese manufacturing practices in the context of sustainable housebuilding in the United Kingdom, Unpublished PhD Thesis, , University of Edinburgh.

Kanellopoulos, G (2022) External fire spread from timber lined compartments, Unpublished PhD Thesis, , University of Edinburgh.

Kim, S (1998) Sustainable building practices: minimising the life-cycle environmental impact of high-rise apartments in Korea, Unpublished PhD Thesis, Department of Architecture, University of Edinburgh.

Knebel, V (2006) Preserve and rebuild: the built environment, status transformations and identity construction in eastern Germany after reunification, Unpublished PhD Thesis, Department of Sociology, University of Edinburgh.

Koutsomarkos, V (2023) Developing a fire robustness index for the built environment, Unpublished PhD Thesis, , University of Edinburgh.

Marquardt, G (2017) Economic analysis of contract choice, feelings of entitlement and contract enforcement in relationships governed by incomplete contracts, Unpublished PhD Thesis, School of Economics, University of Edinburgh.

  • Type: Thesis
  • Keywords: contracts; experiment; investment; litigation; negotiation; trust; validation
  • ISBN/ISSN:
  • URL: http://hdl.handle.net/1842/23573
  • Abstract:
    The first chapter of this thesis considers a contractual principal-agent relationship in an unstable environment. The players are uncertain whether repeated interaction is possible. I examine the role that the deliberate choice of an incomplete (non-verifiable and unenforceable) contract plays in signalling stability and trust. In this model, contractors may privately observe shocks that force them to end the relationship after the current period. Complete (verifiable) contracts, which are assumed to be feasible, ensure cooperation in compliance with the contract. With incomplete contracts, the players make themselves vulnerable to exploitation by their partners. But if cooperation occurs notwithstanding, the contractors update their beliefs about each other’s willingness to interact again. When the agent observes that her partner and herself are able to continue the relationship, she undertakes a non-contractible, mutually beneficial investment. The second chapter is based on the theory by Hart and Moore (QJE, 2008) that regards contracts as reference points for feelings of entitlement. Parties’ ex post performance depends on whether they receive what they feel entitled to, which is assumed to be the best possible outcome permitted by the contract. Consequentially, there exists a trade-off between contractual flexibility (agreement on a price interval) and rigidity (agreement on a single price). Hart and Moore do not analyse the role that third party contract enforcement plays for parties’ feelings of entitlement, shading on performance and contract choice. I demonstrate that Hart and Moore’s results rely on a number of assumptions that can be challenged when incorporating litigation into the model. They assume that trade is voluntary but renegotiation is prohibited. I argue that either trade is voluntary but renegotiation is possible or courts compel parties to trade according to the contract. In the former scenario, fixed price contracts may not act as reference points and the parties feel entitled to the best possible outcomes from renegotiation. In the latter scenario, contracts may act as reference points because of the option of contract enforcement. However, potential flexibility incorporated in the contract is lost. The third chapter provides an experimental examination of the effect of contract enforcement on contractors’ reference points for feelings of entitlement. Previous experiments by Fehr, Hart and Zehnder (AER 2011) analyse and support the theory by Hart and Moore (QJE, 2008) that contracts are reference points. Both theory and experiments ignore the role of contract enforcement for contractors’ feelings of entitlement. I replicate and confirm Fehr, Hart and Zehnder’s baseline experiment. I also run an additional treatment in which buyers can offer sellers more or less favourable prices than specified in the contract, whereas sellers can request enforcement of contracts as written. I find that contract enforcement matters, without being invoked, for sellers’ punishment behaviour through feelings of entitlement. Without explicit contract enforcement, flexible contracts (agreement on a price range instead of a single price) leave sellers feel entitled to the best possible price permitted by the contract. However, buyers rarely offer such a price which leads to disappointment and punishment. With the option of contract enforcement, sellers feel entitled to the price which the court would enforce, even if it is equally unfavourable than in the no court treatment. The presence of the court provides an outside validation for which prices are reasonable and thereby limits disappointment and punishment.

McArthur, J (2023) Enrolment, technical mediation, and the obligatory passage point: a socio-technical examination of the Canada Green Building Council, Unpublished PhD Thesis, , University of Edinburgh.

McMeel, D (2009) The artistry of construction: an investigation into construction as a creative process and the influence of mobile phones within domestic scale construction projects, Unpublished PhD Thesis, Department of Architecture, University of Edinburgh.

Oliver, A K (2020) Perceptions of sustainability and their influence in the design and delivery of Scottish housing, Unpublished PhD Thesis, School of Engineering, University of Edinburgh.

Oswald, D (2016) Investigating unsafe acts on a large multinational construction project, Unpublished PhD Thesis, School of Engineering, University of Edinburgh.

Raman, P G (1977) Information and architectural design: A study of certain theoretical aspects, Unpublished PhD Thesis, , University of Edinburgh.

Rodger, R G (1976) Scottish urban housebuilding, 1870-1914, Unpublished PhD Thesis, , University of Edinburgh.

Ronzani, M (2019) Designing for complexity: Data visualizations in megaproject management, Unpublished PhD Thesis, , University of Edinburgh.

Saoud, E A B (1996) Expert systems for management training in the construction industry, Unpublished PhD Thesis, Department of Civil and Environmental Engineering, University of Edinburgh.

Sidwell, N C (1957) A critical examination of new constructional techniques and their influence on productivity in the building industry with special reference to housing in south-east Scotland, Unpublished PhD Thesis, School of Engineering, University of Edinburgh.

Smith, S D (1994) Production estimation of earthmoving operations using a discrete-event simulation model, Unpublished PhD Thesis, Civil Engineering, University of Edinburgh.

Yang, S-A (1995) Kics: Representation of regulatory information and the use of case-based reasoning to support the relaxation process, Unpublished PhD Thesis, , University of Edinburgh.